CO129-488 - Governor Sir Stubbs - 1925 [1-7] — Page 188

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

86

HONGKONG ESTIMATES

PUBLIC WORKS.

Original Revised Estimate. Estimate.

1924.

Approved Revised Estimated Estimated Expenditure Expenditure

1924.

Estimated Expenditure

1925.

$

$

$

FOR THE YEAR 1925.

179

[Class VI] 87

PUBLIC WORKS.

Origina! Revised Estimate. Estimate.

Revised Approved Estimated Estimated Expenditure Expenditure

1924.

1924.

Estimated Expenditure

1925.

3. PUBLIC WORKS EXTRA-

ORDINARY.—Contd.

Brought forward,

COMMUNICATIONS.

114 Roads :-

(a.) Metalling and tar painting hilly portion of Lai Chi Kök-Castle Peak

and Taipo Roads,

(4) Tuipo Market, kerbing and chau-

nelling, &c.,

(e.) Taipo Road,-Widening and im- !

proving from 5th milestone to Shatin...

(2) Widening eleven bridges, (e) Surfacing and strengthening those portions of main road shuning through paddy,

(f) Extension of Roads in Kowloon

Tong Development Aren,

(9.) Waterloo Road extension (100 feet wide) Section between Kowloon Boundary to foot of hills S.E. of tamel (estimate for 150 foot width),

*

7,200,200

3. PUBLIC WORKS EXTRA-

ORDINARY.-Contd.

Brought forward,

$

*

$

7,840,200

30,000

30,000

30,000

MISCELLANEOUS.

5,000

5,000

5,000

******

30,000

1,000

6,000

10,000

10,000

45.000

10.000

20,000

20,000

117 Kowloon Tong Development Scheme:—

(.) Resumption,

(6.) Excavation and filling,

30,000

50,000

20,000

118 Refuse Dump,-Cheung Sha Wan,

20,000

5,000

45,000

119 Chinese Cemeteries, -Laying out new

120 Opening up of Quarry, Castle Peak,

10,000

18,000

(4) Fauling to Sha-tau-kok Road, (4) Path from Ta Ku Ling to Lin Ma

5,000 160,000

13,000

5,000

121 Filling in large area at Kowloon City,...

60,000

75,000

Hong for patrol purposes,.

15,000

122 Telephone cable between Kowloon,

Taipo & Fanling,

(J) Road to shun Wan,

10,000

10,000

(A) Taipo Market to Kam Sban,..

8,500

5,000

123 Miscellaneous Works,

(4) Widening two bridges at An Tau

and Kum Tsin,

40,000

124 Compensation and Resumptions,

10,000

60,000

10,000

280,000

100,000

120,000

120,000

1,000

1,000

1,000

2,000

2,000

2,000

5,000

10,000

5,000

60,000

20,000

82,000

15,000

15,000

15,000

20,000

65,000

100,000

(m.) Macadamizing Taipo Road between

5th and 9th Mile,

(.) Maendamizing road from Fanting

to Sheung Shui Train Halt,

(o.) General Works,

DRAINAGE.

115 Training Nullabs :-

(a.) One side wall and invert of nullal

on Eastern side of the Kowloon Tong Development. Scheme,........... (b.) Kowloon Tong Development Area,

171

connection of stream North of this area to main nullab, (.) Shamshuipo, extension of existing Nanchang Street Nallah to Taipo Road,

(d.) General Works,

116 Miscellaneous Drainage Works :—

(a.) Maiu sewer from Fuk Tsum Heung

25,000

WATER WORKS.

25,000

30,000

50,000

30,000

125 Extension of Kowloon Catchwater,.

190,000

120,000

60,000

50,000

126 Shek Lai Pui, Reservoir and Contingent

Worn 8,

260,000

200,000

75,000

120,000

127 Shing Mun Valley Scheme :-

70,000

$0,000

50,000

20,000

(u.) Resumptions,

50,000

50,000

5,000

45,000

(b) Access road (Tsun Wan to Pine

Apple Pass),

30,000

(e) Temporary lutako and Conduit,

25,000

20,000

10,000

10,000

5,000

5,000

5,000

(4.) North Conduit,

30,000

(e.) Tunnels and South Conduit,.

400,000

in a North-easterly direction Taipo Road,

to

25,000

25,000

25,000

(b.) Storm

water draius from Nan Chang Street Nullah in the direc- tion of Kowloon Tong Village,..................

15,000

15,000

5,000

10,000

(c.) Kowloon Tong Developmeut

Schome, Sewers,

100,000

25,000

10,000

50,000

(d.) Kowloon Tong Development Scheme,

portion of Storm Water drains.................

200,000

50,000

5,000

75,000

(/) Reception Reservoir,

(9.) Filtering plant and erection,......................

(4) Pipe lino,...

Fi.) Pipers Hill Reservoir,

(.) Harbour Pipe,..........

50,000

100,000

20,000

90,000

10,000

(e) General Works,

20,000

53,000

40,000

128 Kowloou Bywash Reservoir,

10,000

Carried forward..................

$ 7,840,200

129 Fanling Water Works Scheme,

30,000

40,300

7,000

1,000

7,000

Total Public Works, Extraordinary,..

9,187,200

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.